Skip to main content

PowerPro 2021 - Build Release 6

Change to USI Web Services V4,  SVTS Reporting fixes, Report on Contact Log Follow up, new Units file and some minor fixes

 

USI Web Services Version 4

From September this year the USI will only accept Student Management System connections to Version 4 of their Web Services. Build 6 takes care of this by forcing the PowerPro connection to use the USI Web Services Version 4 endpoint. 
 
The PowerPro USI interface tool shows the Web Services version used:




SVTS Reporting fixes

Recent SVTS (Victoria) AVETMISS uploads revealed issues with the AVETMISS files which have all been fixed in build 6:
 
  • The Contact details in the NAT00010 were blank
  • The Recognition Identifier was not included in the NAT00100 generating an "Incorrect file format" error
  • The delivery mode field in the NAT00120 was incorrect
  • The "Use Secondary ID" option was not populating the Client Secondary ID in the NAT00120 file 

These fixes are very important to any Provider submitting AVETMISS data to SVTS.

 

Contact Log report can now filter on Follow up date

The Contact Log report now supports filtering the records by their Follow up date:
 


New Units file

Build 6 ships with a fresh snapshot of all units available in https://training.gov.au.
 
 
 

Small fixes

The following minor fixes have also been packaged into this build:
 
  • Prevented Bulk Delete Enrolments from deleting Enrolments with results or Invoice payments
  • Bulk Verify USI was not picking up name "Override" fields for Students with long names
  • Improved the layout and field list of the Attendance>Attach Client window
  • Fixed a typo on Web>Sync Web Course list window
  • Other smaller improvements
 
That's all for Build 6.
 

Popular posts from this blog

Introducing PowerPro 2025

Our team has been working hard to bring you the 2025 update bringing you more automation and customisation options, let’s explore the improvements and additions we’ve made!  An image is worth a thousand words. The first thing you will notice in PowerPro 2025 is its new skin. This skin matches the palette of colours used by the PowerPro logo for a more consistent look across the board. Other skins are still available should you prefer a different look for PowerPro 2025. Please find our FAQ with instructions to update to 2025  here ⭐ Compliance The Continuous Improvement Register has a new structure to meet the new Standards for RTOs coming in July 2025. The ‘Standards' dropdown menu showing the new Outcome Standards, Compliance Requirements and Credential Policy. This is a big update as the standards have been unchanged since 2015. You can find more details about these changes on the ASQA website here See the screenshot below showing how the new Standards dropdown works - even ...

Power Pro 2022 is Here!

Power Pro 2022   Welcome to 2022,  This post celebrates the release of the major annual update, PowerPro 2022. We are looking forward to sharing the many changes and upgrades with all of you.    In order to update to PowerPro 2022 please ensure you are logged in as RTOADM and that you are running PowerPro 2021 build 10 or higher.  The Release and build are shown on the bottom left of the PowerPro main screen:     Once logged in, use the new Update to 2022 button found in the Update ribbon tab to update to PowerPro 2022:   And follow the prompts to complete the update. Please read on for an in depth look at all the changes.   What’s new in 2022? PowerPro 2022 comes with significant new functionality and enhancements to the user interface.  Here is a quick read summary: Official release of PowerQR Parchment Validator Support for tracking Covid-19 vaccination status. This field can also be captured on the online enrolment form. Menu improve...

PowerPro 2024

We’re proud to announce the release of PowerPro Version 2024. Version 2024 combines refinements, performance improvements, stronger integrations and common user requests. Please read on for details on PowerPro 2024.   Improved login interface  A progress bar provides a responsive user interface during the login process: Faster loading and a more relevant background chart The new background top chart lists the number of enrolments per month during the last 12 months. This chart loads quicker, and its data is more relevant than the 2023 chart: Improved layout, look and feel PowerPro 2024 ships with a modern skin and a redesigned layout. The result is a more ergonomic user interface which we believe will be welcomed by most users. Legacy skins are still included in PowerPro 2024 should users prefer to use these instead. TGA Unit list integration In the past PowerPro installations imported units of competency from a data file sourced from training.gov.au (TGA...